PCS Cubberley ES WSM (LLB) CC24-0764-08-00-P1 

Preconstruction Services: the anticipated duration for preconstruction services is seven (7) months with construction beginning May 5, 2025. Destructive Testing may be required via a pre-construction services amendment at a later date.
   ​Cubberley ES -WSM (PCS)                                      PSA Specialist:
   3201 Marathon Dr., San Diego, CA 92123                 Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        01/23/24
        None in PCS phase                                                             Bid award:   04/30/24 
  
​        ***Anticipated Construction start 04/2025***
  
  
  
  
collapse Document Types : Bid Documents ‎(5)
Ad_RFP Cubberley Elementary School_CC24-0764-08-00-P1.pdf
  
1/30/2024 2:53 PMCruz Maria
Final Results Cubberley ES WSM LLB CC24-0764-08-00-P1.pdf
  
5/13/2024 5:18 PMCruz Maria
GC Balfour Beatty LOA.pdf
  
5/13/2024 5:19 PMCruz Maria
Notification Email_Bid Advertisement JOB WALK Bid opening Board Award.htm
  
1/31/2024 10:36 AMCruz Maria
RFP Precon Cubberley ES WSM.pdf
  
1/30/2024 2:54 PMCruz Maria